CW3.3 Hydraulic Structure for Sub Project 1(Porcupines Installation at the Secondary Channels of Ayeyarwaddy)

CW3.3 Hydraulic Structure for Sub Project 1(Porcupines Installation at the Secondary Channels of Ayeyarwaddy)


Figure 1: Porcupine Installations at the Secondary Channels of Ayeyarwaddy River


Figure 2: Porcupine Installation at Sagaing channel (1.1.2020)


Figure 3: Drone Photo of Porcupines in Sagaing Channel (1.1.2020)


Figure 4: Drone Photo of Porcupines in Middle Channel (1.1.2020)


Figure 5: Drone Photo of Porcupines in New Channel (1.1.2020)


Figure 6: Drone Photo of Porcupines in Moe Meik Channel (1.1.2020)

Share this post