30Mar
Read more...
30Mar
Read more...
30Mar
Read more...
30Mar
Bidding Documents – Works
- RFQ for CW1.1.1 Civil Works V6 - clean version (PMU Building)
- 3 STOREYED PMU BUILDING (DWIR-ARCHI PDF) (PMU Building Architectural Drawings)
- 3 STOREYED PMU BUILDING (DWIR-STRUCTURE PDF) (PMU Building Structural Drawings)
- 3 Storeyed PMU Building (DWIR- ELV -PDF ) (PMU Building ELV Drawings)
- 3 Storeyed PMU Building (DWIR- Electrical- PDF) (PMU Building Electrical Drawings)
- 3 Storeyed PMU Building(DWIR- MECH-PDF) (PMU Building Mechanical Drawings)
- CW2.1 Bidding Document-clean version (CW2.1 Meeting Room Upgrade, DMH Yangon Office)
30Mar
Bidding Documents – Non-Consultancy Services
- S2.2 Clarifications No.2 (S2.2 Topographic Survey Services to Support Flow Survey)
- S2.2 Clarifications No.1 (S2.2 Topographic Survey Services to Support Flow Survey)
- S2.2 Topographic Survey BD- Clean version (S2.2 Topographic Survey Services to Support Flow Survey)
30Mar
Bidding Documents – Consultancy Services
Bidding Documents - Consultancy Services will be posted here...
29Mar
Bidding Documents – Goods
- G1.11-ITQ clean version (G1.11 Server, Desktop and Accessories for PMU Office)
- G3-4 Addendum 3 - 22 Aug 2017 (G3.4 Multifunctional Buoy Handling Vessel)
- G3-5 Clarification No. 1 - 18 August 2017 (G3.5 Supply of Amphibious Multipurpose Dredger)
- G3-4 Clarification No. 2 -14 August 2017 (G3.4 Multifunctional Buoy Handling Vessel)
- G3-4 Addendum 2 - 14 Aug 2017 (G3.4 Multifunctional Buoy Handling Vessel )
- G3-4 Addendum 1 (G3.4 Multifunctional Buoy Handling Vessel)
- G3-4 Clarification No. 1 (G3.4 Multifunctional Buoy Handling Vessel)
- G3-4 V12 Bidding Document issued to the Bank (G3.4 Multifunctional Buoy Handling Vessel)
- G3.3 Clarificatioins No. 2 to the questions received from prospective bidders (G3.3 Clarificatioins No. 2 to the questions received from prospective bidders)
- G3.4 Bidding Document - Multifunctional Buoy Handling Vessel (G3.4 Bidding Document - Multifunctional Buoy Handling Vessel)
- G3.3 Clarificatioins No. 1 to the questions received from prospective bidders (G3.3 Clarificatioins No. 1 to the questions received from prospective bidders)
- G3.3 Addendum 1 (G3.3 Addendum 1)
- Shopping G1.10 -PMU Data Network- ITQ-clean version (PMU Data Network Infrastructure – Hardware and Software)
- G1.6-ITQ clear version 27Feb2017 (Accounting Software)
- G2 1 -Fibercable Installation- ITQ- clean version - revised on 23 2 17 (Fiber cable Installation and Transmission for data Network for DMH Office in Nay Pi Taw)
- G2.2 - ADCP Flow Meters ITQ clean version- Dec 20 (ADCP Flow Meters and Associated Equipment)
- G3 1- RFQ for Speed_Hydrographic Survey Boats (revised clean version) 21Dec2016 rev (Speed / Hydrographic Survey Boats)
- G1 9-ITQ Vehicles -clean version (Vehicles)
- WB G3 2 Topo-hydrograpic survey equipment - revised RFQ October 19 - FINAL (Topo-hydrographic survey equipment, satellite images and maps, including installation of equipment and training in surveying)
- Shopping G2.1.3 Generators (Generators)
29Mar
Read more...